Erection &
Commissioning
Troubleshooting
Renovation & Maintenance
Uprating
Residual Life Assessment
Troubleshooting
Hydraulic Disturbances
Pressure Pulsation
(a)Vortex Formation
(b)Caviation Damage
Mechanical Failure
Material Analysis
Structural Analysis
Operational Problems
Mechanical Problems
Governing and Control Problems
Renovation and Modernization
For Non-BHEL make
India
|
S.No. |
Project |
Original Supplier |
Scope |
|
1 |
KOYNA
STG II |
Charmilles |
Runner
|
|
2 |
ALIYAR |
Neyrpic |
Runner |
|
3 |
SABARIGIRI |
Allis
Chalmers |
Runner
Repair |
|
4 |
BURLA |
English
Electric |
Runner,
Guide vane Repair |
|
5 |
PERIYAR |
Voith |
Guide
Brg. Lower Plate , Runner Labyrinth |
|
6 |
SARKARPATTI |
Hitachi |
Runner,
Labyrinth |
|
7 |
CHIPLIMA
|
Hitachi |
Runner
Chamber |
|
8 |
GANGUWAL |
Westinghouse |
Runner |
|
9 |
KOTLA |
Westinghouse |
Runner |
|
10 |
DHALIPUR |
Litostroj |
Underwater Part Repair |
|
11 |
KHATIMA |
English
Electric |
Runner ,
Runner Chamber Top Cover
|
|
12 |
SENGULAM |
English
Electric |
Governor
overhauling |
|
13 |
PATHRI |
Voith |
Runner,
Guide vane, Shaft |
|
14 |
NIZAM
SAGAR |
English
Electric |
Repair
of Runner, Link mechanism |
|
15 |
CHENANI |
Ganz
Mavag |
Runner |
International
|
S.No. |
Project |
Original Supplier |
Scope |
|
1 |
SAROBI,
AFGANISTAN |
J.M.Voith ,
Germany |
Overhauling
of Turbines, Intake and Draft Tube
Gates, Main Inlet Valves |
Uprating
|
Project |
Rated Capacity
(MW) |
Uprated Capacity
(MW) |
Net Gain (MW) |
|
BHAKRA
LEFT BANK |
5 X 90 |
5 X 108 |
90 |
|
KOYNA -
III |
4 X 80 |
4 X 88 |
32 |
|
UKAI |
4 X 75 |
4 X 86 |
44 |
|
RAMGANGA |
3
X 60 |
3 X 66 |
18 |
|
BAIRA-SIUL |
3
X 60 |
3 X 66 |
18 |
|
LOWER
JHELUM |
3
X 35 |
3 X 38.5 |
10.5 |
|
BHAKRA
R.B |
5 X 120 |
5 X 132 |
60 |
|
CHILLA
|
4 X 36 |
4 X 39 |
12 |
|
UTTARKASHI |
3
X 31 |
3
X 34.1 |
9.3 |
|
BALIMELA
|
6
X 60 |
6 X 66 |
36 |
|
UMIUM
ST-III |
2 X 30 |
2 X 33 |
6 |
|
LOKTAK |
3 X 30 |
3 X 33 |
9 |
|
KALINADI |
6
X 135 |
6
X 150 |
90 |
|
GANGUWAL |
1X24.2 |
1X26 |
1.8 |
|
KOTLA |
1X24.2 |
1X26.2 |
2 |
|
VAITARANA |
1 X 60 |
1 X 66 |
6 |
TOTAL
|
54 SETS |
|
444.6 MW |
|