logo_bhel.jpg (4385 bytes)

bpl_hindi.jpg (6561 bytes)
BHARAT  HEAVY ELECTRICALS LIMITED, BHOPAL

HOME

BHOPAL PROFILE

BHEL BHOPAL PROFILE

PRODUCT PROFILE

PRESS RELEASES

COMMUNITY PAGE

CUSTOMER PAGE

DISCUSSION FORUM

FAQs

CONTACT US

 

Health Monitoring System for Hydro Power Stations

 

hydrp_pwr_stn.jpg (20793 bytes)

 

BHEL   HAS ENTERED INTO THE AREA OF HEALTH MONITORING SYSTEMS  FOR HYDRO  POWER STATIONS.HEALTH MONITORING IS AN ONLINE INSIGHT INTO THE CONDITION AND BEHAVIOR OF RUNNING MACHINES. KEY AND CRITICAL PROCESS DATA (AIR  GAPS,VIBRATION, TEMP- ERASURES, LEVEL,FLOW etc)OF VARIOUS EQUIPMENT(SUCH AS TURBINE, GENERATOR, TRANSFORMERS  etc ) ARE COLLECTED  FROM  THE MACHINE.

 

 

THE DATA COLLECTED IS THEN ANALYZED USING SOFTWARE FOR "DATA MANAGEMENT " AND "MACHINE CONDITION MANAGEMENT"

IT IS PROPOSED TO TRANSMIT THE DATA FROM THE POWER HOUSE TO CUSTOMER’S HEADQUARTERS / BHEL SERVICE CENTERS.

RECOMMENDATIONS CAN THEN BE PROVIDED , FOR EFFECTIVE MANAGEMENT OF THE CRITICAL PARAMETERS.

THE ABOVE ANALYSIS OF DATA LEADS TO THE FOLLOWING ADVANTAGES:

  • INCREASE IN PLANT SAFETY BY MINIMISING CATASTROPHIC CONDITIONS
  • IMPROVEMENT IN PRODUCT QUALITY BY OPERATING THE MACHINES AT OPTIMUM PARAMETERS.
  • MAXIMISING AVAILABILITY OF THE PLANT .
  • REDUCTION IN PLANT OPERATING COSTS BY REDUCING UNPLANNED SHUTDOWNS
  • INSTALLATION OF THIS SYSTEM WILL BE COST AND TIME EFFECTIVE.

RENOVATION AND MODERNIZATION

NON-BHEL SETS (INDIA)

Sl No. PROJECT ORIGINAL SUPPLIER SCOPE
1 KOYNA STG II Charmilles Runner
2 ALIYAR Neyrpic Runner
3 SABARIGIRI Allis Chalmers Runner Repair
4 BURLA English Electric Runner, Guide vane Repair
5 PERIYAR Voith Guide Brg. Lower Plate , Runner Labyrinth
6 SARKARPATTI Hitachi Runner, Labyrinth
7 CHIPLIMA Hitachi Runner Chamber
8 GANGUWAL Westinghouse Runner
9 KOTLA Westinghouse Runner
10 DHALIPUR Litostroj Underwater Part Repair
11 KHATIMA English Electric Runner , Runner Chamber Top Cover
12 SENGULAM English Electric Governor overhauling
13 PATHRI Voith Runner, Guide vane, Shaft
14 NIZAM SAGAR English Electric Repair of Runner, Link mechanism
15 CHENANI Ganz Mavag Runner

NON-BHEL SETS (ABROAD)

Sl No. PROJECT ORIGINAL SUPPLIER SCOPE
1 SAROBI, AFGANISTAN J.M.Voith
Germany
Overhauling of Turbines, Intake and Draft Tube Gates, Main Inlet Valves